Server installs · Infrastructure projects

Server builds and migrations built to last.

Windows Server 2025, Active Directory, storage, and identity projects, scoped from the wiring closet up. Built for long-term serviceability, not one-off heroics.

What we build

Six common server project types covering most of what non-profits and small businesses need.

Windows Server 2025 installs

Clean installs on current hardware. Role planning, hardening, and post-install documentation included.

Active Directory & Entra ID

Domain controllers, Group Policy design, OU structure, Entra ID Connect hybrid identity, and cleanup of messy AD.

File & storage servers

RAID 5/6/10 builds, AD-group permissions, DFS namespaces, backup integration. Planned for recoverability.

RADIUS / NPS authentication

Windows NPS rollouts integrated with AD for 802.1X on Meraki wired and wireless networks.

Server migrations

Phased moves from legacy Windows Server or cloud-to-cloud consolidations. Rollback plans and cutover windows in writing.

Hypervisor & virtualization

Hyper-V host builds, guest VM planning, and Proxmox deployments to reduce licensing overhead.

What every server build includes

Documentation your future IT person, or your auditor, will thank us for.

Build documentation

Hardware inventory, serials, install dates, roles, licence keys (in your vault), and the runbook. PDF plus editable source.

Network & role diagram

Visual map of roles, dependencies, storage volumes, IP assignments, and backup flow. Updated on change.

Patch & change log

Every change logged with date, reason, and actor. A defined patch cadence so updates don't surprise you at month-end.

Hardening checklist

SMB signing, unused service shutdown, least-privilege admin, audit policy, firewall rules. A signed-off checklist.

How a server project goes

From first conversation to production cutover.

STEP 01

Discover

We inventory your environment, storage, current identity, and backup approach.

STEP 02

Design

Written build plan with hardware specs, vendor quotes, role layout, and cutover steps.

STEP 03

Build

Hardware racked, OS installed, roles configured, data migrated in a planned maintenance window.

STEP 04

Handover

Documentation delivered, admin access transferred, 30-day stabilization. Optional managed service after.

Planning a server build or migration?

Send us your existing environment, target outcome, and timing. We come back with a scoped plan and real pricing.